DAY 120
Doing a lot of "mopping up" the last few days...some last bits of electrical wiring...finishing up my staining of the wood panels I cut up last week...and the floor tile in my foyer/hallway/bathroom is about 80% done. There will be some grouting tomorrow so the plumber can come back and finish the bathroom fixtures...my last two doors that have been leaning against the wall for a couple of weeks now will get installed (front door and studio door)...and that will bring me to a close with my one contractor.
My other guy will be here on Saturday to cut up some window extensions for me, and some of the beam trim...and then he's gone for a one week vacation, but when he comes back the following week, the hardwood floor will be going in.
So it looks by the end of the second week in March...I will be pretty much finished with the contractors AFA the build. My hardwood floor guy will be then finishing up some siding outside, but the studio will be ready for some treatment and the moving in of audio gear.
It's been a long haul...but it's getting there, and I should have the studio fully furnished and wired by the end of April I think...or close to it, considering that things got a little behind with the build.
AFA my overall house remodeling goes...I'll have some more work into the spring, some painting...and I still haven't gotten back to my kitchen cabinets, which I started refinishing back in the summer ....but at this point their are prepped, I just need to paint them.
I probably won't be posting any more pics until I at least get some acoustic treatment up, and all the trim work is done...but I'll still update the thread with my progress occasionally.
Doing a lot of "mopping up" the last few days...some last bits of electrical wiring...finishing up my staining of the wood panels I cut up last week...and the floor tile in my foyer/hallway/bathroom is about 80% done. There will be some grouting tomorrow so the plumber can come back and finish the bathroom fixtures...my last two doors that have been leaning against the wall for a couple of weeks now will get installed (front door and studio door)...and that will bring me to a close with my one contractor.
My other guy will be here on Saturday to cut up some window extensions for me, and some of the beam trim...and then he's gone for a one week vacation, but when he comes back the following week, the hardwood floor will be going in.
So it looks by the end of the second week in March...I will be pretty much finished with the contractors AFA the build. My hardwood floor guy will be then finishing up some siding outside, but the studio will be ready for some treatment and the moving in of audio gear.
It's been a long haul...but it's getting there, and I should have the studio fully furnished and wired by the end of April I think...or close to it, considering that things got a little behind with the build.
AFA my overall house remodeling goes...I'll have some more work into the spring, some painting...and I still haven't gotten back to my kitchen cabinets, which I started refinishing back in the summer ....but at this point their are prepped, I just need to paint them.
I probably won't be posting any more pics until I at least get some acoustic treatment up, and all the trim work is done...but I'll still update the thread with my progress occasionally.