
frederic
New member
Well, the summer blew by and I didn't touch my studio, so it remains dusty and unspackled. The contractors that remodeled our bathroom did such a darn good job, that I've contracted them to mudd/spackle my studio. $400 including all materials. Can't beat that. And there are a ton of nasty, oddball corners that I've already screwed up. Price includes fixing such things 
So, by next weekend, I should have the studio completely done as far as major construction, and I can prime and paint it, then slap up the mouldings, then weld together the console table. I was so excited I've already cut all the steel for the table. What a huge pile!
After the table is done, down goes hardwood flooring. Love hardwood. Looks nice, smells nice, just really makes for a nice comfy room. I'll do that *after* I weld the console table as not to damage it. Already have the planking too

So, by next weekend, I should have the studio completely done as far as major construction, and I can prime and paint it, then slap up the mouldings, then weld together the console table. I was so excited I've already cut all the steel for the table. What a huge pile!
After the table is done, down goes hardwood flooring. Love hardwood. Looks nice, smells nice, just really makes for a nice comfy room. I'll do that *after* I weld the console table as not to damage it. Already have the planking too
