Hey, THanks John. I will send more details and pictures as things progress. So far the pics are of the beginning stages of the vocal booth and control room. I am remodeling the entire basement for audio recording.
text for the pictures and also a layout for Dconcepts
Okay, thanks John. I have included text for the pictures and a basic layout. Oh yeah! All construction work is done by my dad of Covington & Sons Building & Repair.
1st pic- Look from live room and client area.
2nd pic from left to right- Look from control room out to booth. 3rd pic- Look into Vocal Booth Door. 4th pic- Look from Vocal Booth window into Live and Client Area. 5th pic-Look From Client area to Vocal booth and control room wall.
6th pic- Look at ceiling of Vocal Booth.
Here is the actual layout plan I am using. Everything except the recreation area. If you can please try to modify the grey studio site layout. I hate to be represented wrong. Thank you.