Rick,
Well.. there are some duct boxes, but because of the city's little game with me, I had to cut bait on some non-crucial ones. It might come back to bite me, but so far so good.
I *did* get all of the electronic dampers and flex ducting installed!!
As for the trim, my thought was to attached the baseboard only via screw to the RC channel (NOT the studs)... this shouldn't short anything. The door jambs/casing would be attached to the door jamb itself and NOT the wall, so that the door wouldn't short the wall.
Speaking of shorts... the drywallers caused me all kinds of headaches. I had to go down CONSTANTLY and check their work because they kept "forgetting" how to do resilient channel. Grrrr... I fixed probably 20 screws a night after they did their work on the first layer.
The GOOD news is, when they did the second layer, the screws weren't long enough to touch the framing even if they tried... that made life a little easier.
Its hard to tell how effective everything is right now, because there are gaps in the walls where the doors will go... so putting anything down there that makes noise right now simply jumps through those open gaps and can be heard upstairs.
Interestingly enough, while the workers were here... they had their radio CRANKED and I couldn't hear it upstairs... even without doors!
My sons guitar amp on the other hand was a completely different beast
I'm optimistic and anxious to have it done. My thought is, it can't possibly be any worse than where I have to record now... and it stands the chance to be 1000 times better!
I'll grab better pictures this weekend if I can.
Jim