If you have 2 walls already with proper studs staggared, then your ok... Resiliant channeling is a way to do that using less space, and less lumber..
Instead of building 2 complete walls with an airspace, you build one, and then screw the channeling on top of it, and then screw another layer of drywall onto the channeling...
Yeah, it will hold 3 layers.. just make sure it's staggered and enough screws...
EDIT>> Actually, come to think of it, im not sure of you can layer resiant channeling like that....
First, you put wood studs, up, and then drywall over them.....
Then, the RC screws through the drywall into the studs, and then you put drywall over that...... but then you have no studs in between the RC, so I don't see a way to stagger the next layer of RC....
Hmmmmmmmmmmm.
I will leave the rest of this for the studio building pros...