D
DigitalDon
New member
Yeah it's me again. Sorry I haven't posted lately but things are starting to move again. Between contractors and budget ..... never mind
Just mounted all the track lights in the live room last night. I'll be wiring them in tonight. They're really looking good and the room is really taking shape.
Already painted the suspended ceiling grid (very dark navy blue). I'm picking up the ceiling tile (128 pieces) in about an hour. We will start painting them tomorrow (dark navy blue). Of course we'll put down plastic and lay them on the floor to paint and dry. I'm sure if we painted them outside the sun would curl them (wet on one side, dry on the other). The tile is Armstrong Cortega (?) non-directional at $2.16 each if anyones interested.
More pics soon. I promise I'll put them in one thread this time
DD

Just mounted all the track lights in the live room last night. I'll be wiring them in tonight. They're really looking good and the room is really taking shape.
Already painted the suspended ceiling grid (very dark navy blue). I'm picking up the ceiling tile (128 pieces) in about an hour. We will start painting them tomorrow (dark navy blue). Of course we'll put down plastic and lay them on the floor to paint and dry. I'm sure if we painted them outside the sun would curl them (wet on one side, dry on the other). The tile is Armstrong Cortega (?) non-directional at $2.16 each if anyones interested.
More pics soon. I promise I'll put them in one thread this time

DD