OK, so I had Electrical, Mechanical, and Framing reinspected.
The Electrical and Mechanical passed!!!
Now, to get the framing signed off, I have to install firestops between all the adjacent interior walls.
What this means, specifically, is at the top of 2 adjacent walls, (like between the CR and the Drum Room) I have to put up a nailer, and then fit in some 5/8" drywall in there. Supposedly, this keeps fire from entering the "attic" should it start between the walls.
This will "link" the 2 rooms.
I guess I have to do it, just to get it signed off. I suppose I could go back and cut a slit down the middle of it, after its signed off.
Seems like a lot of trouble.
The Electrical and Mechanical passed!!!
Now, to get the framing signed off, I have to install firestops between all the adjacent interior walls.
What this means, specifically, is at the top of 2 adjacent walls, (like between the CR and the Drum Room) I have to put up a nailer, and then fit in some 5/8" drywall in there. Supposedly, this keeps fire from entering the "attic" should it start between the walls.
This will "link" the 2 rooms.

I guess I have to do it, just to get it signed off. I suppose I could go back and cut a slit down the middle of it, after its signed off.
Seems like a lot of trouble.