S
SonicClang
Part 4720981 coming soon!
I'm finally finishing up my control room window. The walls were completed over 5 years ago!
The MDF is going to be covered in red oak veneer everywhere the sills are visible. Between the glass is going to be 2" studio foam.





The MDF is going to be covered in red oak veneer everywhere the sills are visible. Between the glass is going to be 2" studio foam.