
Freudian Slip
New member
Sooooo. been redoing this house for about 7 months. Here is the section of the basement we finished for a live room. It will be treated an modified later once we are living in the house. I will also be finishing a control room, drum booth and 1 or 2 iso rooms along with a full bathroom off the back of the controll room. The live room is 600 sq ft and there is still 600 sq ft to go.
Anyway since the live room is 90% done, I thought I'd post it.
F.S.
Anyway since the live room is 90% done, I thought I'd post it.




F.S.