DigitalDon
New member
With the sheetrock going up I'm finally able to see how the studio will really look. Damn I'm glad all the resilient channel is finally up. Between the channel and sheetrock I've already gone through a box of 1,000 screws! It's really been a pain screwing into the channel because it flexes (like it's supposed to) when mounting the sheetrock. Anyhow, here's a pic and some more following it. I don't know how to attach more than one pic so I'll show them in succession. Pics are of the live room. Through the left window is the vocal booth. Through the right window is the control room. We hope to be taping and mudding this weekend.
DD
DD