A
adam2112
New member
I have a porject with multiple time signature and tempo changes. I need to insert two measures at the beginning of the project and have the marker for the time/tempo changes move accordingly.
Ex. I have a time/tempo change at measure 50. After I insert two measures it should now be at measure 52.
Ex. I have a time/tempo change at measure 50. After I insert two measures it should now be at measure 52.