My A/C contractor asked if I could lower the ceiling in the bathroom and Mech. closet to 9'.
Its currently at 10'
The 10' height allows me to simply run stringers across the top caps of the walls.
But there's no top caps at 9'.
Should I use some lag bolts to bolt a header to the studs at 9', and use joist hangers on those to hold the 2x4 framing for the ceiling?
I have no doubt that that would be sturdy enough to hold up the sheetrock, but keep in mind these guys are going to be standing on this thing as they do the duct work up there. And the top of that, the attic side, would get decked with 3/4" plywood.
Any thoughts?
Its currently at 10'
The 10' height allows me to simply run stringers across the top caps of the walls.
But there's no top caps at 9'.
Should I use some lag bolts to bolt a header to the studs at 9', and use joist hangers on those to hold the 2x4 framing for the ceiling?
I have no doubt that that would be sturdy enough to hold up the sheetrock, but keep in mind these guys are going to be standing on this thing as they do the duct work up there. And the top of that, the attic side, would get decked with 3/4" plywood.
Any thoughts?