Pics of My Studio Conception to Finish

What Do You Think of My Humble Setup?


  • Total voters
    84

studiogenocide

New member
Over the next few days, I am going to give a recap on the conception of my humble recording studio loaded with pics. I learned so much from this forum, the guys in here are irreplaceable in their knowledge, and to that I thank you all. Our studio will open in mid December, and we already have a lineup of folks who want to record with me. We are very excited, and again I want to thank all of you who put in your priceless input, especially Rick Fitzpatrick, (who for some reason ignored my last messages?) who's knowledge and expertise in the construction and treatment of recording studios is impeccable. Again, I will be posting some pics throughout the week recapping the project from start to finish.

These first pics are of the first couple days we received the building.
 

Attachments

  • bare wall down.jpg
    bare wall down.jpg
    60.7 KB · Views: 1,823
  • 1st day.jpg
    1st day.jpg
    63.7 KB · Views: 1,862
Here are some of the walls going up and the wiring for electrical and network cables.
 

Attachments

  • wiring1.jpg
    wiring1.jpg
    59.7 KB · Views: 1,772
  • bare wall.jpg
    bare wall.jpg
    60 KB · Views: 1,751
  • wiring2.jpg
    wiring2.jpg
    59.2 KB · Views: 1,752
  • wiring3.jpg
    wiring3.jpg
    54.9 KB · Views: 1,752
Here are some of insulation getting installed and some drywall. We doubled the amount of drywall in the booth and control room side wall.
 

Attachments

  • insulate1.jpg
    insulate1.jpg
    62.4 KB · Views: 1,739
  • insulate2.jpg
    insulate2.jpg
    59.9 KB · Views: 1,724
  • drywall4.jpg
    drywall4.jpg
    57.2 KB · Views: 1,717
  • drywall3.jpg
    drywall3.jpg
    58.2 KB · Views: 1,717
More Drywall / insulation pics of control room and recording booth.
 

Attachments

  • drywall5.jpg
    drywall5.jpg
    50.4 KB · Views: 1,699
  • drywall2.jpg
    drywall2.jpg
    61.5 KB · Views: 1,686
  • entryboothb4.jpg
    entryboothb4.jpg
    55.2 KB · Views: 1,723
  • entryboothb42.jpg
    entryboothb42.jpg
    61.8 KB · Views: 1,715
Pics of the control room coming together.
 

Attachments

  • drywall6.jpg
    drywall6.jpg
    54.6 KB · Views: 1,687
  • aclights.jpg
    aclights.jpg
    56.1 KB · Views: 1,688
  • acpaint.jpg
    acpaint.jpg
    55.3 KB · Views: 1,674
  • painttrimac.jpg
    painttrimac.jpg
    50.3 KB · Views: 1,700
Pics of us finishing the painting of the control room and cutting out of window.
 

Attachments

  • finishedwall2.jpg
    finishedwall2.jpg
    52.6 KB · Views: 1,674
  • finishedwall1.jpg
    finishedwall1.jpg
    50.9 KB · Views: 1,696
  • finishedwall3.jpg
    finishedwall3.jpg
    58 KB · Views: 1,674
  • prewindow1.jpg
    prewindow1.jpg
    55.3 KB · Views: 1,697
Setting up the desk and other odds and ends inside the unfinished control room.
 

Attachments

  • control1.jpg
    control1.jpg
    57.3 KB · Views: 1,709
  • control2.jpg
    control2.jpg
    59.3 KB · Views: 1,713
pics of the recording booth - before...
 

Attachments

  • entryboothb42.jpg
    entryboothb42.jpg
    61.8 KB · Views: 1,675
  • entryboothb43.jpg
    entryboothb43.jpg
    53.9 KB · Views: 1,656
  • entryboothb4.jpg
    entryboothb4.jpg
    55.2 KB · Views: 1,663
  • prebooth.jpg
    prebooth.jpg
    58.9 KB · Views: 1,672
pics of the booth after drywall, mud, and windows installation...
 

Attachments

  • boothalmost1.jpg
    boothalmost1.jpg
    29.8 KB · Views: 1,675
  • boothalmost2.jpg
    boothalmost2.jpg
    21.5 KB · Views: 1,675
What the both looks like now!!!
 

Attachments

  • boothfinish1r1.jpg
    boothfinish1r1.jpg
    49.4 KB · Views: 1,400
  • boothfinish2r1.jpg
    boothfinish2r1.jpg
    52.2 KB · Views: 1,391
  • boothfinish3r1.jpg
    boothfinish3r1.jpg
    37 KB · Views: 1,377
  • boothfinish4r1.jpg
    boothfinish4r1.jpg
    41.8 KB · Views: 1,398
Who did the hack electrical work? No staples on the boxes, no connectors on the branch circuits at the service, no separate neutral and ground bar for sub panel. Neutral and ground cannot be bonded at a sub panel. Is that romex inside pipe as a service feeder?

Did you use wire nuts on the grounds in the outlet boxes? Are all metal boxes grounded? Did you install a ground rod outside the building? Did you bond the structure? (since it is a metal building) No use of nail plates on any of the drilled studs.

Looks like more than 8 outlet boxes per circuit too. That is a lot of outlets for only two 20 amp home runs.

I hope your fire insurance is paid up but they won't cover work like that.

The rest is cool though.
 
A further look at those pics, Is that black wires running to the neutral bar? Are you using the bare ground in the main feed as the neutral? You really need to have somwone that knows what they are doing check and fix all of that for you before someone gets hurt.
 
I'm going to steal your studio while you're sleeping! MAHAHAHAHA! Ignore the sound of trucks going "beeep beeep beeeep beeeep"... it's uhh just the crickets.
 
What the control room and mixing desk looks like now...
 

Attachments

  • panelsaircond.jpg
    panelsaircond.jpg
    56 KB · Views: 1,273
  • Backwallpanels.jpg
    Backwallpanels.jpg
    58.9 KB · Views: 1,275
  • deskchairroom.jpg
    deskchairroom.jpg
    59.4 KB · Views: 1,272
  • straitdesk.jpg
    straitdesk.jpg
    59.5 KB · Views: 1,274
Who did the hack electrical work? No staples on the boxes, no connectors on the branch circuits at the service, no separate neutral and ground bar for sub panel. Neutral and ground cannot be bonded at a sub panel. Is that romex inside pipe as a service feeder?

Did you use wire nuts on the grounds in the outlet boxes? Are all metal boxes grounded? Did you install a ground rod outside the building? Did you bond the structure? (since it is a metal building) No use of nail plates on any of the drilled studs.

I hope your fire insurance is paid up but they won't cover work like that.

Between me and my uncle, we wired the building the best way we knew how. Look Oshman, I can take a little constructive criticism, but your post is borderline insulting. I do not claim to know electrical wiring do's and dont's, and the reason for the pics was not to show off my obvious lack of electrical engineering skills, but to show how hard we all worked at making my little dream a reality. And yes, it is insured, and in Florida any building less than 500 square feet does not require an electrical permit, so it will be covered in the event my piss poor job at wiring results in an electrical fire. Now back to posting those pics!
 
Back
Top