TAE
All you have is now
Well if shit were slow this remodel would be a pile of it. Sitting near the end of the tunnel and can see the light but it is like watching grass grow at the moment...The minutia of details that have to be planned out before the drywall goes up...ugh... Have had to move some receptacles and plugs...Wife did not like the height placement of the sink window soooooo....had to lower it @ 6" meaning stucco repair on the outside...damn! Fortunately timing was right as I had a stucco guy coming for the two windows we closed up in the same kitchen so he banged out the repair at the same time. It never rains in California except for when you have your drywall guys scheduled to show up and install..That was on Tuesday...nope They are supposed to come on Saturday and hang the drywall. I may have mentioned I am going tankless water heater...Well I have bought it but was not planning to install till I did the complete repipe and new water line from the meter...Fate was not willing to wait...yesterday the wife tells me there is no hot water.... I go out and try and relight it ...nope tear it apart it is leaking on the burner and it's bye bye water heater time...so today I am installing the tankless in a semi temporary kind of way so we have hot water and I'll come back to it and install it the complete pro way I was going to with recirc pump when I get the complete re-piping completed...Onward and upward. Cali is wet and Cold..we got 3" of rain on Tuesday...nice snow capped mountains and mid 30's in the early morning. Brrrrrr!